The level of power facility licenses for contracting (repair, test) is divided into first, second, third, fourth and fifth grades. China Hardware Business Network
Classification (repair, test) power facility license level classification and classification The first license is divided into three categories: contracting, repairing and undertaking.

Those who have obtained the permit for the installation category may engage in the installation activities of the electric power facilities.

Those who have obtained the license for the maintenance category may engage in the maintenance activities of the electric power facilities.

Those who have obtained the test permit may engage in the test activities of the power facilities.

The second license is divided into Level 1, Level 2, Level 3, Level 4 and Level 5.

Those who have obtained the first-class license can engage in the installation, maintenance or testing activities of all voltage-level power facilities.

Those who have obtained a secondary license may engage in the installation, maintenance or testing activities of power facilities with voltage levels below 220 kV.

Those who have obtained the third-level license can engage in the installation, maintenance or testing activities of power facilities with voltage levels below 110 kV.

Those who have obtained a four-level permit can engage in the installation, maintenance or testing activities of power facilities with voltage levels below 35 kV.

Those who have obtained a five-level permit can engage in the installation, maintenance or testing activities of power facilities with voltage levels below 10 kV.

Applicable to the following regions:

Northeast: Liaoning, Jilin, Heilongjiang

North China: Hebei, Shanxi, Inner Mongolia, Beijing, Tianjin

East China: Shandong, Jiangsu, Anhui, Zhejiang, Fujian, Jiangxi, Shanghai

Central China: Henan, Hubei, Hunan

South China: Guangdong, Guangxi, Hainan

Southwest: Yunnan, Guizhou, Chongqing, Sichuan, Tibet

Northwest China: Xinjiang, Shaanxi, Ningxia, Qinghai, Gansu

Chapter 1 Standard for Contracting (Repair, Test) Power Facilities License Level

The first level of installation (repair, test) power facilities license level is divided into first, second, third, fourth and fifth.

Article 2 If a power facility permit for the first-level contracting (repair, test) is obtained, it may be responsible for the installation of all voltage-level transmission, power supply, and power-receiving facilities. Applicants for the first-level contracting (repair, test) power facility permit shall have the following conditions:

(1) Having the legal person qualification and perfect organization;

(2) The registered capital is not less than 40 million yuan and the net assets are more than 48 million yuan;

(3) Two or more of the following projects have been undertaken within 5 years, and the quality of the project is qualified:

1.330 kV or more of the transmission line of 300 km or 220 kV or more of the transmission line of 500 km;

2. 2 substations of voltage substations above 2330 kV or 5 substations of voltage class above 220 kV;

3. A cross-over project of 80 km or more of cable lines of more than 220 kilovolts or more than 100 meters above the tower.

(4) The maximum annual project settlement income of the power installation business within 3 years is more than 100 million yuan;

(5) The technical person in charge has more than 10 years of experience in the installation and management of power facilities, and has the qualifications of senior technical engineers above the power professional;

(6) Professional and technical personnel and economic management personnel with not less than 160 persons, including no less than 100 engineering and technical personnel; among the engineering and technical personnel, no less than 60 persons with professional qualifications for intermediate or above professional degree in electric power;

(7) A power professional first-level registered construction engineer or a power professional first-class qualification project manager with not less than 15 persons;

(8) There shall be no less than 60 employed electricians in the work permit, including no less than 30 high-voltage electricians;

(9) The budgetary staff who have the "Certificate of Professional Management Personnel for Construction Enterprises and Institutions" shall have not less than 5, the installation chief shall be no less than 20, the full-time quality inspector shall be no less than 3, and the construction contract manager shall not be less than 3 people;

(10) It has a full-time safety management organization and a sound safety management system. The safety engineer has the professional technical qualifications of the electric power professional engineer or above, and the full-time safety supervision personnel are not less than 3;

(11) having construction machinery and quality testing equipment that are compatible with the scope of the project;

(12) It has a sound technical file management system.

Article 3 If a second-level contracting (repair, test) power facility permit is obtained, it may undertake the installation of power transmission, power supply and power receiving facilities below 220 kV. Applicants for secondary equipment installation (repair, test) power facility licenses shall meet the following conditions:

(1) Having the legal person qualification and perfect organization;

(2) The registered capital is not less than 20 million yuan and the net assets are more than 24 million yuan;

(3) Two or more of the following projects have been undertaken within 5 years, and the quality of the project is qualified:

1.220 kV or more transmission lines 400 km or 110 kV or more transmission lines 500 km;

2. 220 substations or 220 substations of voltage substations above 220 kV;

3. The cable line of 3.220 kV or more is 40 km or the cable line of 110 kV or more is 80 km.

(4) The highest annual project settlement income of more than 60 million yuan within 3 years;

(5) The technical person in charge has more than 8 years of experience in the installation and management of power facilities, and has the qualifications of senior technical engineers above the power professional;

(6) Professional and technical personnel and economic management personnel with no less than 120 persons, including no less than 70 engineering and technical personnel; among the engineering and technical personnel, no less than 30 persons with professional qualifications for intermediate or above majors in electric power;

(7) A registered construction engineer with a power level of 2 or more or a project manager with a secondary qualification of a power professional with not less than 10 persons;

(8) There shall be no less than 50 employed electricians in the work permit, including no less than 25 high-voltage electricians;

(9) The budgetary staff with the "Certificate of Professional Management of Construction Enterprises and Institutions" shall have no less than 4 persons, no less than 15 installation workers, no less than 2 full-time quality inspectors, and no less than 2 construction contractors. 2 people;

(10) It has a full-time safety management organization, and the safety engineer has the qualifications of professional technicians above the power professional; the full-time safety supervision personnel are not less than 2;

(11) having construction machinery and quality testing equipment that are compatible with the scope of the project;

(12) It has a sound technical file management system.

Article 4 If a power installation permit for repairing (repairing or testing) a three-level contracting type is obtained, it may undertake the installation of power transmission, power supply and power receiving facilities below 110 kV. Applicants for the three-level contracting (repair, test) power facility permit shall have the following conditions:

(1) Having the legal person qualification and perfect organization;

(2) The registered capital is not less than 10 million yuan and the net assets are more than 12 million yuan;

(3) The following projects have been undertaken within 5 years, and the quality of the project is qualified:

1. The transmission line of 110 km or more above 110 kV or the transmission line of 10 km or more is 400 km;

2. 2 substations of voltage level above 110 kV or 4 substations of voltage level above 10 kV;

(4) The highest annual project settlement income of more than 20 million yuan within 3 years;

(5) The technical person in charge has more than 5 years of experience in the installation and management of power facilities, and has the qualifications of professional engineers above the power professional;

(6) Professional and technical personnel and economic management personnel with not less than 50 persons, including no less than 30 engineering and technical personnel; among the engineering and technical personnel, no less than 10 persons with professional qualifications for intermediate or above majors in electric power;

(7) A registered construction engineer with a power level of 2 or more or a project manager with a secondary qualification of a power professional with not less than 5 persons;

(8) There shall be no less than 40 employed electricians in the work permit, including no less than 20 high-voltage electricians;

(9) The budgetary staff who have the "Certificate of Professional Management of Construction Enterprises and Institutions" shall have no less than 3 budget members, no less than 10 installation workers, no less than one full-time quality inspector, and no less than one construction contract manager. 1 person;

(10) There is a safety management organization, and the safety engineer has the professional technical qualifications of the electric power professional engineer; the full-time safety supervision personnel are not less than one;

(11) having construction machinery and quality testing equipment that are compatible with the scope of the project;

(12) It has a sound technical file management system.

Article 5 Whoever obtains the four-level contracting (repair, test) power facility permit can undertake the installation of power transmission, power supply and power receiving facilities below 35 kV. Applicants for four-level contracting (repair, test) power facility licenses shall meet the following conditions:

(1) Having the legal person qualification and perfect organization;

(2) The registered capital is not less than 5 million yuan and the net assets are more than 6 million yuan;

(3) The technical person in charge has more than 4 years of experience in the installation and management of power facilities, and has the qualifications of professional engineers above the power professional;

(4) Professional and technical personnel and economic management personnel with not less than 30 persons, including no less than 15 engineering and technical personnel; among the engineering and technical personnel, no less than 5 persons with professional qualifications for intermediate or above professional degree in electric power;

(5) A registered construction engineer with a power level of 2 or more or a project manager with a second-level qualification of a power professional with not less than 2 persons;

(6) There shall be no less than 30 employed electricians in the work permit, including no less than 15 high-voltage electricians;

(7) The budgetary staff with the "Certificate of Professional Management of Construction Enterprises and Institutions" shall have no less than 2 persons, no less than 6 installers, no less than 1 part-time quality inspector, and no less than 1 construction contract manager. 1 person;

(8) There is a safety management organization, and the safety engineer has the professional technical qualifications of the electric power professional engineer; the part-time safety supervision personnel is not less than one;

(9) having construction machinery and quality testing equipment that are compatible with the scope of the project;

(10) It has a sound technical file management system.

Article 6 If a power installation permit for repairing (repairing or testing) a five-level contracting type is obtained, it may undertake the installation of power transmission, power supply and power receiving facilities below 10 kV. Applicants for the five-level contracting (repair, test) power facility permit shall have the following conditions:

(1) Having the legal person qualification and perfect organization;

(2) The registered capital is not less than 2 million yuan and the net assets are more than 2.4 million yuan;

(3) The technical person in charge has more than 3 years of experience in the installation and management of power facilities, and has the qualifications of professional engineers above the power professional;

(4) Professional and technical personnel and economic management personnel with not less than 8 persons, including no less than 5 engineering and technical personnel; among the engineering and technical personnel, no less than 2 persons with professional qualifications at or above the intermediate level of the power major;

(5) A registered construction engineer with a power level of 2 or more or a project manager with a second-level qualification of power major with not less than one person;

(6) There shall be no less than 15 employed electricians in the work permit, including no less than 5 high-voltage electricians;

(7) The budgetary staff with the "Certificate of Professional Management of Construction Enterprises and Institutions" shall have no less than 2 persons, no less than 6 installers, no less than 1 part-time quality inspector, and no less than 1 construction contract manager. 1 person;

(8) Equipped with at least one part-time safety management personnel, and the safety engineer has the professional technical qualifications of the electric professional engineer;

(9) having construction machinery and quality testing equipment that are compatible with the scope of the project;

(10) It has a sound technical file management system.

Chapter II Standards for Undertaking (Repair, Test) Power Facilities License Level

Article 7 The level of power facility licenses for maintenance (repair, test) is divided into Level 1, Level 2, Level 3, Level 4 and Level 5.

Article 8 Whoever obtains the first-level repair-type (repair, test) power facility permit may undertake the maintenance of all voltage-level transmission, power supply, and power-receiving facilities. Applicants for the first-class maintenance category (repair, test) power facility permit shall have the following conditions:

(1) Having the legal person qualification and perfect organization;

(2) The registered capital is not less than 40 million yuan, and the net assets are more than 48 million yuan;

(3) Having the maintenance experience of power facilities with a capacity of more than 330 kV for more than 2 years or having the maintenance experience of power facilities with a capacity of more than 220 kV for more than 4 years;

(4) The technical person in charge has more than 8 years of experience in the maintenance and management of electric power facilities, and has the qualifications of senior technical engineers above the power professional;

(5) Technical and economic professionals (including senior technicians, technicians and senior workers) with not less than 100 persons, including no less than 60 senior engineers, engineers and engineers in power engineering;

(6) There shall be no less than 60 employed electricians in the work permit, including no less than 40 high-voltage electricians;

(7) It has a full-time safety management organization and a sound safety management system. The safety engineer has the qualifications of professional engineers above the electric power professional engineer; the full-time safety supervision personnel are not less than 3;

(8) having maintenance equipment that is compatible with the scope of the project;

(9) It has a sound technical file management system.

Article 9 If a power installation permit for repairing (repairing or testing) a secondary maintenance category is obtained, it may undertake the maintenance of power transmission, power supply and power receiving facilities below 220 kV. Applicants for secondary equipment maintenance (repair, test) power facility licenses shall meet the following conditions:

(1) Having the legal person qualification and perfect organization;

(2) The registered capital is not less than 20 million yuan and the net assets are more than 24 million yuan;

(3) Having the maintenance experience of power facilities with a capacity of more than 220 kV for more than 2 years or having the maintenance experience of power facilities with a capacity of 110 kV or more for more than 4 years;

(4) The technical person in charge has more than 5 years of experience in the maintenance and management of electric power facilities, and has the qualifications of senior technical engineers above the electric power professional;

(5) Technical and economic professionals (including senior technicians, technicians and senior workers) with not less than 50 persons, including no less than 30 senior engineers, engineers and engineers in power engineering;

(6) There shall be no less than 50 employed electricians in the work permit, including no less than 30 high-voltage electricians;

(7) It has a full-time safety management organization, and the safety engineer has the professional technical qualifications of the electric power professional engineer; the full-time safety supervision personnel are not less than 2;

(8) having maintenance equipment that is compatible with the scope of the project;

(9) It has a sound technical file management system.

Article 10 Whoever obtains a three-level contract for repairing (repairing, testing) power facilities shall be able to undertake the maintenance of power transmission, power supply and power facilities below 110 kV. Applicants for the three-level maintenance category (repair, test) power facility permit shall have the following conditions:

(1) Having the legal person qualification and perfect organization;

(2) The registered capital is not less than 10 million yuan and the net assets are more than 12 million yuan;

(3) Having the maintenance experience of power facilities with a capacity of 110 kV or more for more than 2 years or having the maintenance experience of power facilities with a capacity of more than 10 kV for more than 4 years;

(4) The technical person in charge has more than 5 years of experience in the maintenance and management of electric power facilities, and has the qualifications of professional engineers above the power professional engineer;

(5) Technical and economic professionals (including senior technicians, technicians and senior workers) with not less than 30 persons, including no less than 15 senior engineers, engineers and engineering technicians in power engineering;

(6) There shall be no less than 40 employed electricians in the work permit, including no less than 25 high-voltage electricians;

(7) There is a safety management organization, and the safety engineer has the professional technical qualifications of the electric professional engineer; the full-time safety supervision personnel are not less than one;

(8) having maintenance equipment that is compatible with the scope of the project;

(9) It has a sound technical file management system.

Article 11 Whoever obtains the four-level maintenance contract for repairing (repairing, testing) power facilities may undertake the maintenance of power transmission, power supply and power receiving facilities below 35 kV. Applicants for the four-level maintenance category (repair, test) power facility permit shall have the following conditions:

(1) Having the legal person qualification and perfect organization;

(2) The registered capital is not less than 4 million yuan and the net assets are more than 4.8 million yuan;

(3) The person in charge of technology has more than 3 years of experience in the maintenance and management of power facilities, and has the qualifications of professional engineers above the power professional;

(4) Technical and economic professionals (including senior technicians, technicians and senior workers) with not less than 20 persons, including no less than 8 senior engineers, engineers and engineering technicians in power engineering;

(5) There shall be no less than 20 employed electricians in the work permit, including no less than 10 high-voltage electricians;

(6) There is a safety management organization, and the safety engineer has the professional technical qualifications of the electric power professional engineer; the part-time safety supervision personnel is not less than one;

(7) having maintenance equipment that is compatible with the scope of the project;

(8) It has a sound technical file management system.

Article 12 Whoever obtains a five-level contract for repairing (repairing and testing) power facilities shall be able to undertake the maintenance of power transmission, power supply and power receiving facilities below 10 kV. Applicants for the five-level contracting (repair, test) power facility permit shall have the following conditions:

(1) Having the legal person qualification and perfect organization;

(2) The registered capital is not less than 1 million yuan and the net assets are more than 1.2 million yuan;

(3) The person in charge of technology has more than 3 years of experience in the maintenance and management of power facilities, and has the qualifications of professional engineers above the power professional;

(4) Technical and economic professionals (including senior technicians, technicians and senior workers) with not less than 10 persons, including no less than 5 senior engineers, engineers and engineering technicians in power engineering;

(5) There shall be no less than 10 employed electricians in the work permit, including no less than 5 high-voltage electricians;

(6) Equipped with at least one part-time safety management personnel, the safety engineer has the professional technical qualifications of the electric professional engineer;

(7) having maintenance equipment that is compatible with the scope of the project;

(8) It has a sound technical file management system.

Chapter III Acceptance (Repair, Test) Power Facilities License Level Standard

Article 13 The level of power facility licenses for undertaking (repair, test) is divided into first, second, third, fourth and fifth grades.

Article 14 If a power facility permit for the first-level test-type (repair, test) is obtained, it may bear the test of all voltage-level transmission, power supply and power-receiving facilities. Applicants for the first-class test-type (repair, test) power facility permit shall have the following conditions:

(1) Having the legal person qualification and perfect organization;

(2) Having a test experience of power facilities with a capacity of more than 330 kV for more than 2 years or a test experience of power facilities with a capacity of more than 220 kV for more than 4 years;

(3) The registered capital is not less than 40 million yuan and the net assets are more than 48 million yuan;

(4) The person in charge of technology has more than 8 years of experience in the trial management of power facilities, and has the qualifications of senior technical engineers above the power professional;

(5) Technical and economic professionals (including senior technicians, technicians and senior workers) with not less than 100 persons, including no less than 50 senior engineers, engineers and engineering technicians in power engineering;

(6) It has a full-time safety management organization and a sound safety management system. The safety engineer has the qualifications of professional engineers above the power professional; the full-time safety supervision personnel are not less than 3;

(7) It has a fixed business place with a total area of ​​not less than 8,000 square meters, and has various professional laboratories and indoor test halls and test equipment for power transmission, power supply and power receiving facilities capable of testing 220 kV voltage level. Testing outdoor test sites and test equipment for transmission, power supply, and power-receiving facilities at 330 kV;

(8) It has a sound technical file management system.

Article 15 If a power installation permit for repairing (repairing or testing) a Class II test is obtained, it may undertake tests for power transmission, power supply and power receiving facilities below 220 kV. Applicants for the second-level test-type (repair, test) power facility permit shall meet the following conditions:

(1) Having the legal person qualification and perfect organization;

(2) Having a test experience of power facilities with a capacity of more than 220 kV for more than 2 years or a test experience of power facilities with a capacity of 110 kV or more for more than 4 years;

(3) The registered capital is not less than 20 million yuan and the net assets are more than 24 million yuan;

(4) The person in charge of technology has more than 5 years of experience in the trial management of power facilities, and has the qualifications of senior technical engineers above the power professional;

(5) Technical and economic professionals (including senior technicians, technicians and senior workers) with not less than 60 persons, including no less than 35 senior engineers, engineers and engineers in power engineering;

(6) There is a safety management organization, and the safety engineer has the qualifications of professional technicians above the power professional; the number of full-time safety supervisors is not less than 2;

(7) It has a fixed business place with a total area of ​​not less than 3,000 square meters, and has various professional laboratories and test equipment capable of testing transmission, power supply and power receiving facilities with voltage levels below 220 kV;

(8) It has a sound technical file management system.

Article 16 If a power installation permit for a three-level test-type (repair, test) is obtained, it may undertake tests for transmission, power supply and power-receiving facilities below 110 kV. Applicants for the three-level test-type (repair, test) power facility permit shall have the following conditions:

(1) Having the legal person qualification and perfect organization;

(2) Having a test experience of power facilities with a capacity of 110 kV or more for more than 2 years or a test experience of power facilities with a capacity of more than 10 kV for more than 4 years;

(3) The registered capital is not less than 10 million yuan and the net assets are more than 12 million yuan;

(4) The technical person in charge has more than 5 years of experience in the trial management of power facilities, and has the qualifications of professional engineers above the power professional engineer;

(5) Technical and economic professionals (including senior technicians, technicians and senior workers) with not less than 40 persons, including no less than 20 senior engineers, engineers and engineering technicians in power engineering;

(6) There is a safety management organization, and the safety engineer has the professional technical qualifications of the electric professional engineer; the full-time safety supervision personnel are not less than one;

(7) It has a fixed business place with a total area of ​​not less than 800 square meters, and has various professional laboratories and test equipment capable of testing transmission, power supply and power receiving facilities with voltage levels below 110 kV;

(8) It has a sound technical file management system.

Article 17 If a power installation permit for a four-level test-type (repair, test) is obtained, it may undertake tests for transmission, power supply and power-receiving facilities of voltage levels below 35 kV. Applicants for the four-level test-type (repair, test) power facility permit shall meet the following conditions:

(1) Having the legal person qualification and perfect organization;

(2) The registered capital is not less than 8 million yuan and the net assets are more than 9.6 million yuan;

(3) The person in charge of technology has more than 3 years of experience in the trial management of power facilities, and has the qualifications of professional engineers above the power professional;

(4) Technical and economic professionals (including senior technicians, technicians and senior workers) with not less than 20 persons, including no less than 10 senior engineers, engineers and engineering technicians in power engineering;

(5) There is a safety management organization, the safety engineer has the professional technical qualifications of the electric power professional engineer; the part-time safety supervision personnel is not less than one;

(6) It has a fixed business place with a total area of ​​not less than 600 square meters, and has various professional laboratories and test equipment capable of testing power transmission, power supply and power receiving facilities with voltage levels below 35 kV;

(7) It has a sound technical file management system.

Article 18 If a power installation permit for a five-level test-type (repair, test) is obtained, it may undertake tests for transmission, power supply, and power-receiving facilities at voltage levels below 10 kV. Applicants for the five-level test-type (repair, test) power facility permit shall have the following conditions:

(1) Having the legal person qualification and perfect organization;

(2) The registered capital is not less than 4 million yuan and the net assets are more than 4.8 million yuan;

(3) The person in charge of technology has more than 3 years of experience in the trial management of power facilities, and has the qualifications of professional engineers above the power professional;

(4) Technical and economic professionals (including senior technicians, technicians and senior workers) with not less than 10 persons, including no less than 5 senior engineers, engineers and engineering technicians in power engineering;

(5) Equipped with at least one safety management personnel, and the safety engineer has the qualifications of professional technicians or above;

(6) It has a fixed business place with a total area of ​​not less than 400 square meters, and has a professional laboratory and test equipment for transmitting, power supply and receiving power facilities capable of testing voltage levels below 10 kV;

(7) It has a sound technical file management system.

China Hardware Business Network
Http://news.chinawj.com.cn Power installation company contracted undertake test list Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn Power installation company contracted undertake test list

Shower Floor Drain

Shower Floor Drain,Square Cover Floor Drain,Bathroom Shower Floor Drain,Shower Linear Floor Drain

Kaiping City Jinqiang Hardware Products Co.,Ltd , https://www.jmkimpowerdrain.com