Naips LED Emergency Ceiling Light-A power failure light with a modern design that provides high quality lighting with an adjustable cct color switch attached to each fixture. Every round light fixture is pre-installed with the built-in lithium ion emergency batterry pack, damp location rated for reliability, ETL listed for your safety, is 85-265V AC input, has a brushed chrome finish, and backed by a 5 YEAR WARRANTY. Led Emergency Ceiling Light,Emergency Led Ceiling Light,Emergency Light For Ceiling,Emergency Light Ceiling Type Foshan Nai An Lighting Electric Co.,ltd , https://www.emballast.com At 8 o'clock on the morning of the 8th, a small section of passengers was introduced. When he was waiting at the Optics Valley Station, he noticed that: On the top of the subway tunnel, a large piece of blue-black paint dropped, and there was continuous leakage of water. In the track pit in the tunnel, water has formed a "river."
There are also some meticulous passengers who have discovered that leakage has also occurred at stations such as Yangjiawan and Jiekou.
On the 8th, the reporter saw in the waiting area inside the subway station Optical Valley Station that some places in the tunnel had drip as “curtains.†The water in the track pit had a depth of three to four centimeters. Affected by the leakage of water, more than 10 layers of paint on the top of the tunnel fell off, and some areas of the paint layer were loosened due to water soaking.
Regarding the occurrence of leakage in the optical valley station, the Wuhan Metro Group stated that they attached great importance and had arranged special personnel to visit the site. The reason for water leakage is that at the initial stage of the subway opening, the sewage from the station floor dragged a large amount of garbage, which caused the floor drain to be blocked and could not be drained properly. The leakage of the paint in the tunnel caused the leakage of paint. At present, they have arranged construction units to repair the floor drains and make additional sprays on the fallen paint.
As for the reasons for leakage at other sites, the MTRCL said it would respond to the investigation and rectify existing problems on the premise of ensuring passenger safety.