Receipt notice Precautions for acceptance of rough housing

"Receiving housing" has two meanings. First, it refers to an intermediary company's conventional operation method. It first uses cash to acquire the main housing sold by the industry, handles notarization procedures, and then transfers it out at a higher price. The other is the act of handling the transfer formalities with the developer after the completion of the housing. Many owners are buying houses for the first time. It is not easy to expect to make a room, but often do not know what to do. Today, Xiao Bian told everyone about the relevant knowledge of the repossession and what are the matters needing attention in repossession .

Reclamation Notice Precautions Acceptance Matters

1, doors, windows

The door is the most easily forgotten place. After the owner happily opened the door with his key, he was most concerned with seeing what the house looked like. The appearance and appearance of the door were left behind. This process is absolutely undesirable. Now the houses are installed with anti-theft doors. After opening the door, you should carefully observe and touch the surface of the door by hand to see if it is flat and there are no scratches or areas that have been impacted. Look at the door frame visually, because the door frame is not correct. Will directly affect the use of your actual life in the future, but also should try to lock back and forth to see if the normal opening, closing, if you encounter problems to timely reflect the property to be replaced.

Today's homes use steel windows and use hollow glass. During acceptance, we must inspect the glass and window frames of each room and carefully look for any debris, water marks, scratches, or glass in the glass. There is water vapor; the window frame is not correct, whether the window is open and closed properly, whether it can reach 90 degrees when the window is opened, and whether the waterproof window is pasted out by hand or not, depends on whether the windows of each window are installed. All right.

2, wall, ground

In the acceptance of the rough house, the wall surface and the ground are the largest and most critical areas. We must check whether the walls of all rooms are flat or whether the floor of the kitchen or bathroom is empty. If the unevenness of the wall will cause a lot of trouble for the decoration in the future, the unevenness of the ground will also affect the later paving or laying of the floor. If there is a hollow area in the wall of the bathroom and the kitchen, it will be easy to fall off after the decoration is attached to the tile.

In order to avoid and early detection of these problems, we can use some lively, easy-to-use methods of earth testing to find a longer bar on the wall and see if the bar is attached to the wall, if there is 1 - The error of 2mm is within the scope of the national standard. If the error is large, the property must be hired to pick up the worker to rehash the wall. We can also take the book and use one of the 90-degree right angles against the corner to see if it is perpendicular to the 90-degree angle of Yin Yang. To see if there is an empty drum on the wall, you can use a small hammer to test and judge whether there is empty drum on the wall by sounding when you tap.

3, electricity

When checking the house, check whether there is electricity in each room. Each room has a simple light bulb to see if they are all normal. The outlets in each room must not be forgotten. It is not very expensive to sell simple electroscopes on the market. We can use test pencils to test whether each outlet has electricity. If you don't have a test pencil, you can use the soil method and use a mobile phone charger or hair dryer.

4, water

In the rough room, toilets and kitchens are well-routed water lines, but most of them have no taps. We can take a bucket of water and pour it into the pipeline to see if the water is blocked or not. If you hear the sound of the water, you can say that the water is very happy. The floor of the bathroom should be well waterproofed, but it is impossible to do a water-blocking test during the inspection because of the conditions. Therefore, we must let the decoration workers do a water-blocking test before the renovation and look for water leakage after 24 hours.

5, ventilation system

Ventilation systems are a big problem that can easily be overlooked during home inspections. Flues and exhaust ducts are places that are easy to leave hidden dangers for daily life.

Many of the owners believe that as long as they are familiar with the rough building built by the construction team, they are very reassuring. Xiao Bian here to remind the majority of owners, in the acceptance of rough housing, must be exhaustive, allowing you to save a lot of worries in the future of home decoration process.

New House Acceptance Notes Accommodate Housing Inspection House Decoration Precautions Home Decoration Precautions

High Wattage Lamp Emergency Conversion Kit

High Wattage Lamp Emergency Conversion Kit can converts high wattage LED luminaire 50-100W in emergency lighting.
With the LiFePO4 emergency battery internal. Its operation is by regulating the luminaire 100% emergency output and maintain 60-90mins emergency time automatically when the main power cuts. Widely using for factory, building, warehouse, school, hospital, library etc.

Replacing Emergency Lights,Best Emergency Light,Automatic Emergency Light,Lamp Emergency Conversion Kit,led battery driver

Foshan Nai An Lighting Electric Co.,ltd , https://www.naipsled.com