In the high prices today, second-hand housing is favored by more and more owners, so second-hand housing decoration has become a major topic in the decoration industry. Second-hand housing renovation actually takes more than just new house decoration, so before the renovation, we must first do enough homework to understand what the old house needs to pay attention to in the process of changing face. Knowledge Process: Second-hand House Renovation Six Links and Time Required 1, find a suitable decoration company As many second-hand houses are now old-fashioned apartments, they are old and have a small room type, so they have been greatly remodeled during renovations, including water line renovation, wall renovation, ceiling treatment, floor renovation, and renovation of doors and windows. It takes time and manpower, and it is prone to various problems, which will affect the construction. However, these problems generally do not appear when fitting a new house, and the decoration is less difficult. Therefore, the second-hand housing renovation is more professional and more demanding. We must do our homework and compare more when choosing a decorating company. Reminder: Everyone must be looking for the company to be "seeing is believing", to go to the construction site to see the construction quality, it is best to find the owner in the decoration to understand the company's "real life." 2, removal and cleaning Because second-hand housing renovations are generally second-hand decoration, the first task is to perform demolition clean-up work, which includes “removing old windows and doors, shoveling off the original wall surface, knocking out the original tiles and the ground, etc..... This part The time required for the work varies according to the area and workload of the different homes, taking a house of 60 square meters as an example, it usually takes about 5-6 days. Reminder: To change the window, Xiao Bian should mention one sentence. Generally speaking, installing a window can be completed only by brushing the wall, wrapping the mouth, and sticking the wall tiles. However, it usually takes a few days to set up the window to the door, so everyone can start early. 3, hydropower reform After the demolition work is completed, the next step is the focus of second-hand housing renovation - hydropower reform. Since the old wires used in the old houses are not only aging, there may be a demand that the capacitors are not suitable for the current home appliances. The water pipes are the same, so basically the water and electricity should be re-layed. This part of the work takes about 2 to 5 days, depending on the size, but at this time we can pick the tiles.... Reminder: Everyone must think clearly before doing hydropower reforms, otherwise it will be very troublesome to do it again! And everyone should pay attention to the following points during construction: (1) If the house is relatively new, if there is no major problem with the main line of strong electricity, you may not need to re-lay all of it. This can be measured on the spot by the decoration company to avoid waste. (2) Weak electricity, mainly telephone lines, network cables, cable TV lines, audio and video cables, etc., should be well thought out in advance when laying out the functions and placement of furniture electrical appliances. To facilitate the use and aesthetics, do a good job of drawing design, construction according to plans. . (3) To change the water, put the water pipe first, then do the pressure test of the water pipe, and then bury the water pipe and wire. (4) After the water and electricity are completely changed, the floor of the kitchen and bathroom, the wall of the shower area, and the floor of the kitchen are generally treated with water-repellent treatment, and then the water-closing experiment is performed. 4. Laying of wall tiles After the completion of hydropower and acceptance, the wall and floor tiles can be laid. Usually, the wall tiles of the bathroom, kitchen or balcony are laid first, and then the floor tiles are used. This is because the first paving tiles may cause wall tiles in the wall tiles. Damage is also troublesome to clean the work. Reminder: If the home is installed on the floor, it will have to wait until the wall paint finish. 5, wall treatment After the tile is finished, you can treat the walls of the bedroom, the living room and the restaurant, including leveling, repairing cracks, scraping putty, etc., and then brushing the latex paint. At the same time, it is also possible to measure cabinets and tops. Reminder: The reason why the cabinet measurement is performed at this time is that the size of the main tile is relatively accurate, and if it is measured in advance, the size of the tile is also estimated. At the same time, it should be noted that the general cabinet needs to wait for about 10 days. 6, install After finishing the wall paint, or when the paint is applied last time, you can install the door and gargle. The production time of the door generally takes about 15 days, so according to this time, it is determined in advance, and finally the lamp, panel, and fixture are installed. Wait. Reminder: If you have furniture made of woodworking, you can paint after painting latex paint. Second-hand House Renovation Notice Contemporary Decoration Window Furniture Decoration Company Latex Paint Decoration Living Room Floor Tiles Kitchen Wall Tiles Kitchen Cabinet Doors Kitchen Cabinet Doors Kitchen Bathroom Ceilings Bathroom Tiles Bathroom Doors Bathroom Wall Tiles Bathroom Dimensions Bathroom Tiles Bathroom Ceilings Toilet Design Toilets Waterproof Toilet Doors Size Restaurant Furniture Apartment Decoration Tile Gluing Restaurant Ceiling Kitchen Tile Balcony Tile ld Tile Small Bedroom Floor Tile Bedroom Lamp The present invention provides a multifunctional pull faucet, comprising: a faucet body, a drawing part is provided at the water outlet port thereof, and the drawing part is connected to a main channel, wherein at least three are provided in the faucet body A branch channel, and the three branch channels are all connected to the main channel. A multifunctional pull faucet provided by the present invention, wherein the hot water channel, the cold water channel and the water purification channel (pure water channel) are all connected to the main channel , And the main channel is connected with the drawing part on the main body of the faucet, so that the drawing part can obtain the water quality (hot water, cold water, purified water or pure water) required by different users, thereby improving the user experience, and , By integrating the hot water channel, cold water channel and pure water channel (pure water channel) into the main channel, the internal structure of the faucet is simplified, and the production cost of the faucet is reduced. Pull Out Faucets,Pull Out Kitchen Tap,Pull Out Sink Faucet,Standard Pull Out Faucet Yuyao Zelin Sanitary Ware Co., Ltd , https://www.zelinfaucets.com
Bingyuan decorating love home custom solid wood furniture