Spring decoration practical manual: home improvement hydropower transformation precautions

Oil workers, bricklayers, carpenters, plumbers, etc., have a number of roles. This is a common situation in the decoration of "guerrillas." Many consumers choose them for saving money. Home decoration supervisor Xiao Xie told the reporter that hydropower reform is the most critical project in the home improvement project, or it does not change at all. To change it, we must select professionals.


Ethino tiles

He suggested that since the hydropower reform belongs to the earliest project in the overall project, it will not conflict with other constructions. If consumers feel that it is costly to find a big brand home improvement company, they can also ask a professional hydropower reform company. The cost is less than that of the big decoration company, and the quality is also guaranteed. However, consumers also have to choose high-profile and powerful companies and sign warranty contracts.

Large parts are determined in advance

According to designer Xiaowang, before the hydropower reform, the owner had better determine the model and type of home appliances he needed, the types and positions of various switches and sockets, and the location of the waterway interface, according to his actual needs and various Home equipment models to reserve space. The kitchen requires the cabinet designer to provide specific water circuit design drawings, and strictly follows the design diagram to arrange the kitchen circuit, the direction of the waterway, and the specific locations of the various switches and interfaces.

Need to determine in advance the brand and specific models of shower room, bath, water heater, kitchen treasure, toilet, ceiling hood, air conditioning and so on. Among them, the shower room with steam function and instant water heater, 26 or more air conditioners generally need 16A sockets, that is, hot water heaters must be individually routed from the distribution box, and use more than 4 square millimeters of the cross-section of the wire, Avoid accidents caused by frequent trips or overheating.

Go to the top

Home decoration supervisor Xiao Xie told reporters that “walking without going to the top” refers to the fact that the pipes must be piped from the ceiling when the pipes are slotted, and they must not be piped from the floor. This is a basic guideline for the reconstruction of kitchen and waterways. It is easy to overhaul.

If the waterway goes to the ground, it is difficult to find problems because the water is flowing down. Water leakage does not necessarily flow out first. Only when the water leaks downstairs or into the flood plain, water leakage will be discovered and it will be dark. Even if you can't find the leak, you can only plan to open the ground, so the loss will be considerable. Circuit traces are not subject to this restriction because the wires are piped and can be overhauled even if problems arise.

Hydropower renovation is the top priority in home decoration, because most of the pipelines are buried and buried. Once a problem occurs after renovation, it can be very troublesome to change it. Therefore, hydropower reform must not only ensure quality, but also fully take into account the needs of use. To this end, the reporter visited the industry experts, summed up some of the precautions in the hydropower reform, hoping to help readers will soon be renovated.


Water and Electricity Acceptance Notice Concealed Decoration Home Improvement Decoration Switch Socket Toilet Decoration Looking for Decoration Company Okay Kitchen & Bathroom Ceiling Household Kitchen Cabinet Kitchen Door Kitchen Tile ld Tile

BLOCK BOARD

Our finger board has mature technology, flat products, and is not easily deformed. It has a complete range of materials, and the manufacturer has an advantage in direct selling prices.

Furniture BLOCK BOARD, Whole Eucalyptus Triamine Substrate Plywood,Melamine Plywood Wood Grain,Wood Grain Melamine Plywood

Linyi Lanshan Weipu Rubber Factory , https://www.wpwoodfloor.com