Renovation put a good material acceptance

Due to neglect of the material acceptance process, the unqualified products will enter the home due to the home-installed construction. According to investigations, in such decoration disputes, due to the failure to do a good job of material acceptance in the early stage, when problems arise in the latter stage, it is often difficult for the owners and construction units to define their responsibilities. In this regard, there are industry insiders appealing that the acceptance of the renovation of building materials must not be sloppy.

>>> Decoration "breaking the routine" with materials surprising wins and save money

It is difficult to determine the responsibility for material acceptance problems

The owner bought a so-called international brand bathroom product. Because of the trust in the brand product, he signed it without careful inspection in the process of home delivery. However, what he did not think of was that when the package was unpacked and installed, the bathtub was found. There are even cracks. He reluctantly said in the complaint post: "At the time of delivery, considering the choice of sanitary ware was an international brand, the quality of the letter had been compared, plus the bathtub was relatively large, outside all sealed with wood, open To check and then reload it is too much trouble to sign the goods directly. Who knows the installation process found that the edge of the bathtub has 4CM cracks.” When he feedback the quality problem to the merchant, the supplier has signed the owner to confirm In response, refused to exchange goods.

For such a situation, people in the industry believe that the identification of building materials such as ceramic tiles, sanitary ware, and flooring is all too much trouble, and that the problems are more likely to occur. There may be problems in transportation, or problems in the installation process. Of course, there may be quality problems in the product itself, so it is very important for the material to be checked on site.

A few owners have accepted the material

For the acceptance of the decoration materials, the results of the survey conducted by the site's editors show that there are quite a few consumers who share the same ideas with the users @Sang Sang@, and 20% of the users who participated in the survey said that due to the busy work, very few There is time to go to the construction site. As for the acceptance of materials, most of them let the decoration workers at the site sign directly. Because of this, material problems have also occurred from time to time.

Miss Shi who is decorating tells Xiao Bian: "For example, flooring, ceramic tile and other packaging materials, in the process of material acceptance is to see if the model number is consistent with the order, and whether there is a problem with their quality, acceptance of There is generally little attention in the process."

Experts how to check the acceptance of decoration materials

In the process of home decoration, there are many disputes related to decorative materials. The reasons for summing up are nothing more than what people often say as "consumer's shoddy" and "the owner's material supply affects the construction progress and quality." In this regard, industry insiders remind everyone that during the renovation, do not be afraid of trouble, we must do a good job of material acceptance.

So how do consumers check materials?

Gong Tingxi, head of the Jiangsu Decoration Supervision Station, said: “In the acceptance process, the owner should carry out the necessary inspections for each material contract stipulated in the contract, such as the brand name, specification, quantity, color, execution standard, and quality level of the material. Whether it meets the requirements of the design and the contract, you can sign the receipt only after you have determined that there are no problems, and for the floors and tiles that cannot be inspected during the inspection, if there are quality problems in the later period, the product provider is also Should bear the corresponding responsibility."

Construction Acceptance Decorating Decoration Home Decorating Home Decor Flooring Flooring Tile Tiles Specifications

fgfghh , https://www.ruiqi-optics.com