PVC plastic sports flooring installation

Mobile installation

The floor and the floor are bonded together by a special connecting belt provided by the manufacturer. The floor and the floor surface are not bonded, and the PVC plastic sports floor can be rolled up or removed at will, and is convenient to move.

Fixed installation

1. Semi-fixed type: special double-sided tape, which is bonded with the special double-sided tape of the manufacturer's matching between the floor and the floor. At the same time, the floor and the floor are also bonded together, which can effectively prevent the floor from happening due to strenuous exercise. Moving, slitting, and making it easy to move the entire site in the future.

2. Partial bonding: 20 cm of adhesive bonding on the ground with the edge of the floor as the reference.

3. Full rubber bonding: all the glue is glued on the ground to be laid.

[Basic requirements]:

The ground floor of the construction must be clean, durable, flat, and free of cracks. The concrete floor moisture content cannot exceed 2.5%. The moisture content of the gypsum floor shall not exceed 0.5%. Before the floor is laid. After the floor is dusted, PVC plastic sports flooring can be laid. If the original ground is uneven, it can also construct self-leveling of about 2mm. If it is non-absorbent ground such as mineral base, stone, ceramic tile, etc., it can be directly paved.

[Note]: If it is a wet floor such as a basement, the floor must be waterproof to isolate water vapor.

installation steps

1. The ground should be laid flat and clean.

2. PVC plastic sports flooring must be laid out in advance to lay the ground 24 small before laying.

Aiqi sports floor above, and the site temperature should not be lower than 15 °C. After the floor is restored, the ends should be kept 5cm more. Before pasting, roll the unfolded floor back about halfway, then scrape the glue – starting from the middle – the glue is applied with a toothed scraper.

3. Arrange in the order of the number of the floor, align and merge, pay attention to the alignment of the site line during the paving process.

4. Open the adjacent two pieces of floor along the joint, place the special connecting belt of the manufacturer on the lower side of the joint, brush the surface of the connecting belt, first stick one of the boards to the half of the connecting belt, then Stick the other half to the remaining connecting straps and tighten the gap.