First, the acceptance before starting the decoration construction Whether the demolished and reformed project meets the requirements of the contract, whether there is a hidden safety hazard, whether the wall surface treatment is clean, and whether the quantity, grade, and specifications of the incoming material are in agreement with the prior agreement. Second, the acceptance of the water circuit The acceptance of the second stage should be a single acceptance of the waterway and circuit transformation. Consumers should check whether all the transformation lines are unobstructed, whether the layout is reasonable, whether the operation is normal, and reconfirm the line transformation under the operation of a professional hydraulic or electrician. Actual size. Only after the line is changed, the putty worker can continue to seal the wall and putty. Third, according to the drawings on the carpentry work size acceptance The third acceptance must be done after the carpentry foundation. At this time, ceilings and plaster lines in the room should also be completed. Wall tiles in the kitchen and bathroom are already attached. At the same time, the painted wall should be scraped twice. Putty. Acceptance work at this stage is very important, consumers should carefully check the drawings, confirm the size of the various parts, if found inconsistent place, promptly prompt the construction team to modify. IV. Quality Acceptance of Carpentry Work When all the fine wood products are finished with a veneer and the wooden thread is nailed, the consumer can perform the fourth stage of acceptance. This time is basically half of the time, the inspection of this stage should focus on the color and texture of wood products and large areas of flatness and gaps are uniform. V. Quality Inspection of Oil Workers After the completion of wood products, oil workers can start the primer treatment work, and all floor tiles should also be posted in this stage, which is the fifth stage in the phased acceptance. Sixth, acceptance after completion The final phase of acceptance is the most comprehensive and thorough. Consumers are required to check the installation of footboards, sanitary ware and hardware, whether the finish of wooden products is in place, whether the paint on the wall or top surface is uniform, whether the panel of the electrician is properly installed and the position of the light fixture, and whether the circuit connection is correct. In addition, the construction team should be required to clean the room thoroughly before being removed. The acceptance stage is not absolute in the actual construction. Different families have different requirements for the decoration content, and the construction progress will naturally have corresponding adjustments, which can be flexibly controlled according to the progress of the project. Entrance decoration Background decoration Decoration paint Decoration of the company Home improvement of the company Looking for decoration company How do you do? Bathroom ceiling material Toilet ceiling Bathroom floor tile Overall bathroom Bathroom size Improve the survival rate of young animals, disposable umbilical cord clamps for pigs, cattle and sheep, which are practical, convenient and sanitary; Umbilical Clamp,Umbilical Cord Clamp,Umbilical Cord Clip,Baby Umbilical Cord Clamp Yong Yue Medical Technology(Kunshan) Co.,Ltd , https://www.yonyuetube.com
The interface is stable and not easy to loosen: the tail interface uses the internal buckle J-shaped embedding design, which has good stability;
Sawtooth to prevent falling: non-slip sawtooth at the mouth of the clamp to prevent detachment in the middle of the way and hurt piglets;
The polymer plastic material is durable and practical: the material will not affect the health of the pigs, it is convenient and hygienic, and it is practical once and not reused.
Home improvement project acceptance 6 important stages
The quality of a home improvement project depends on the construction level of the decoration company. It also depends on the acceptance and daily supervision of the owner. If you only check after the completion of the project, the overall quality of the project will not be fully understood. Then, at what stage should the owner accept it? Below, briefly introduce the major acceptance stages that need attention. At present, the acceptance of home improvement projects is in accordance with Beijing Quality Standard for Home Improvement. Decoration companies should perform quality inspections in accordance with this minimum standard. The formal decoration company will strictly follow this standard, but some issues should pay special attention.