Four points to guard against the winter decoration to defend the war should pay attention

Summer is too hot, winter is too cold, and cold and hot all have troubles for decoration. Two days before the beginning of the winter, he ate hot dumplings and thought about the decoration. Immediately after the end of the year, renovations can be quickly completed, and we will strive to get the decoration done. One of the troublesome things is the decoration materials. I don't know what to do with it. I went to the Internet to collect an article and share with everyone how to do "Winter decoration battle."

Putty: The time and magnitude of windowing are emphasized

If the wall or the ceiling is scraped or put on wallpaper, it must be dried naturally. Do not open the doors and windows to prevent rapid water loss and affect the construction and deformation. The time for window ventilation is also emphasized: It is best to choose between 10:00 am and 4:00 pm. The temperature during this period is relatively high, which can prevent the newly scraped putty from freezing.

The correct way to putty is: After the first pass of putty is completely dry, scrape it again the second time putty; the second time the putty is completely dry and then carefully sanded with sandpaper. Sand gray walls, heat preservation walls are best all affixed cloth, putty put on the cloth directly, until dry thoroughly with sandpaper polished. If there is a large hole in the wall or concave, it is best to use gypsum powder and latex to reconstruct and fill the wall. When there is a large crack on the wall, the cracks should be put on kraft paper and then puttyed. When the area is larger, it is better to put a cloth on it and then scrape the putty, which can prevent the wall surface from being flat and cracking.

Coatings: Construction Environment to Keep Warm

When painters spray various paints, they should apply them in strict accordance with the product description. Under normal circumstances, the ambient temperature applied by the coating should not be lower than 5°C; among them, the commonly used mixed color coating application is that the ambient temperature should be above 0°C, and the ambient temperature when the varnish is applied is not lower than 8°C. The oil workers should pay more attention to “warmth” and open doors and windows after fully drying.

Wood: Sealed oil treatment to prevent windbreak

The purchased materials should not be stored in the open air. After the materials are brought into the construction site, they must be brushed with a layer of clear oil on the surface, also called sealing oil, to prevent wind cracking and deformation. After the decorative panel is shipped to the site, apply a dry towel to wipe off the floating dust, and continuously apply the varnish back cover twice. All the decorative panels should be laid flat. Put a blockboard at the bottom of the decorative panel, and press the panel again. Join the blockboard so that the board remains flat. Never put the panel upright, it will lead to cracking and warping of the panel.

Accessories: mortar can not contain ice, cement not open air

Sand used in construction should be carefully sieved and must not contain ice. When stirring the mortar, the temperature of the water must not exceed 80°C. If cement is required for decoration, it is best not to open it in the open air, and the construction site should also pay attention to insulation.

Winter decoration also has some unparalleled benefits of other seasons, because the low temperature, it is easier to expose some of the construction quality problems, because it is off-season, workers will be more careful construction, building materials will be more affordable. Pay attention to the above matters, winter decoration will be better than other seasons decoration quality, decoration prices lower.

Decoration experience decoration considerations

Dozer Parts

Dozer Parts,Bulldozer Spare Parts,Caterpillar Dozer Parts,Aftermarket Dozer Parts

JINING SHANTE SONGZHENG CONSTRUCTION MACHINERY CO.LTD , https://www.sdkomatsuloaderparts.com