Fire pump anti-corrosion test process

Fire pump factory should be carried out before the flow surface corrosion test, after the test should not have a fire pump performance defects. The specific process is as follows: 1) Before the test with warm water on the flow surface of the fire pump carefully cleaned, should not leave greasy, dirt, cleaning should not use abrasive or solvent. 2) The test solution is prepared by adding distilled water and sodium chloride at a concentration of 10 kg / m3 ± 1 kg / m3. The pump is filled with the solution in a temperature environment of 35 ° C and 2 ° C. After 8 hours, Placed 16h, according to this repeat five cycles. 3) After the test, the solution should be drained pump, over-flow surface with warm water, carefully check the corrosion. 4) The pump casing made of cast iron, cast aluminum, cast copper, other over-current components made of stainless steel, bronze or aluminum alloy and other highly corrosion-resistant materials pump, the above test may not be carried out.

BS Flanges

We offer a complete range of BS table flanges for use with OD tube and nominal bore pipe in carbon steel and stainless steel to tables D, E, F, and H. Specials can be manufactured to customers' special requirements. We offer a range of ASA 150LB raised face, weld neck, blind and slip-on flanges in grades A105, Q235 and 304, 316 to ASTM A182 specification.

BS Flanges,BS4504 Flanges,Steel Forged Flanges,BS 4504 Carbon Steel Flanges

Shandong Zhongnuo Heavy Industry Co.,Ltd. , https://www.znforged.com