The acceptance of the interior decoration is an important step after the new house has been renovated. Generally speaking, we should carry out inspections on all aspects. However, in a relatively short period of time, we cannot do everything we can, therefore, only the most important ones. Check the aspects. Next Xiaobian introduced the interior decoration acceptance standards for everyone. Indoor decoration acceptance standards 1. Hydropower acceptance In the acceptance of water supply and drainage pipes, we must check the quality of the pipeline, whether the valve is installed, the switch is not flexible, remember to pass the pressure test oh, see if there is no leakage of water seepage phenomenon. On the electrical side, when it comes to acceptance, it is necessary to look at whether the various switch sockets are installed correctly and whether there are any cracks. After the power-on test, it is of no use to see if there are any switches and sockets. In addition, the strong and weak power systems must be fully functional. Oh. 2, floor acceptance The floor is generally wooden, so when it comes to acceptance, we should see if the floor is firmly installed, there is no looseness, and the floor is not polished, there are no scratches. If it is a parquet floor, then the seams of the floor should be aligned, the width must be the same, there can be no plastic spill phenomenon, the skirting board should also be closely connected with the floor, and close to the wall. 3, panel acceptance The panel should pay attention to the material, color and paving to meet our requirements during acceptance. The surface should be smooth and flat, and the pattern should be clear. Of course, the edges, bubbling, sticking, and grime marks cannot occur. At the same time, the seams of the panels must be tight and cannot differ by more than 0.5 mm. 4, ceiling inspection For the acceptance of the ceiling, we need to check whether the material's type, specification, color tone and structure are consistent with our requirements and whether it meets the specifications. During the acceptance, we must also pay attention to whether the cover panel is tightly connected with the keel, and it must not be contaminated, broken or any defect. 5, flower decoration acceptance The acceptance of floral ornaments must be completed after the completion of the project and it is completely dry. We must first check the variety, specification and pattern of the floral ornament. For the sake of safety, we must see whether the floral decoration is firmly installed. Any deviation must be within the allowable range. At the same time, we must pay attention to the surface appearance of the floral decoration. 6, paste acceptance When accepting the paste, we must pay attention to that the wallpaper and the wall must be firmly affixed with the same color, no bubbles, empty drums and cracks, and there must be no evidence of missing stickers, subsidies, or delamination. Interior decoration acceptance considerations 1, the wall to be leveled The leveling of the wall directly affects the overall aesthetics. Therefore, the first thing to do in the inspection is to confirm whether the wall surface is flat and there are signs of cracking. Each owner can directly observe with the naked eye, and the problem of timely Where 2, the scene of cleaning After the completion of the renovation, we do not say that we should be as immaculate as the owner of our family at the time. However, at least the ground, the countertops, and the sill should be neat, and there should be no unnecessary decoration garbage. 3, the environmental protection of furniture General furniture is the most likely to lead to excessive formaldehyde in the house. When checking, it is necessary to smell the furniture with a pungent odor. Try to use good wood in the decoration. 4, water and electricity inspection to be careful Hydroelectricity inspection is the most important item for acceptance. The owner can request the decoration company to conduct the pressure test, and the owner is best to participate in it to see if there is any leakage. At the same time can splash a pot of water in the bathroom to see if there is no water phenomenon. Electricity is also an important project. The industry mainly requires the professional electrician of the decoration company to carry out electric power inspection. When the owner accepts the inspection, the lamp can be turned on to see if the power supply is on. See if the power supply is normal, and if problems are found, repair can be done in time. 5, it is best to do environmental monitoring After the acceptance of the decoration, we must promptly ventilate. In the winter, it is best to be between 1 noon and 3 pm. If there are irritating smells after 5 days, it is better to do environmental monitoring. It is necessary to emphasize that the best furniture is not to be fast. Move in so as not to cause liability problems caused by unqualified air quality. Editor's summary: The acceptance criteria for interior decoration are introduced here, and I hope to be helpful to everyone. If you want to know more related information, you can pay attention to this website information. interior renovation Rechargeable Work Light,Rechargeable Led Working Lamp,Magnetic Led Work Light Rechargeable,Cob Led Work Light NINGBO ZHENGUO INTELLINGENT LIGHTING CO.,LTD , https://www.intellingentlighting.com